You need to survey a linear right-of-way: pipeline, road, rail, transmission: that's long and hard to access.
Miles of corridor. Mixed terrain. Vegetation. Property-line management. Every traditional approach is slow.
Pipelines, transmission, fiber, rail, highways. Continuous corridor deliverables for miles.
Continuous corridor deliverables for transmission, pipeline, fiber, and rail — every structure logged, every span measured, from one mobilization.
Structure-by-structureevery tower logged
Sag & clearancemeasured per span
Continuous ROWmiles per mission
Miles of corridor. Mixed terrain. Vegetation. Property-line management. Every traditional approach is slow.
Programmed flight path. Consistent altitude and overlap. Geo-referenced to your control.
High-resolution ortho. LAS/LAZ point cloud. Vegetation encroachment analysis. Sectional profiles.
Pipeline integrity. Road maintenance planning. ROW vegetation management. Rail corridor monitoring.
Linear infrastructure asks for the same data products as a site survey: orthomosaic, classified point cloud, terrain model, encroachment report: just stretched along a narrow ribbon for tens or hundreds of miles. Pipelines, transmission and distribution lines, fiber routes, rail, highways, canals. Skyflex flies long strips with survey-grade control, stitches the captures into a continuous corridor, and hands back a deliverable your operations team can navigate end-to-end.
Short corridors are flown on multi-rotor; longer pulls run on VTOL fixed-wing platforms that can cover dozens of miles in a single sortie. Sensors are survey-grade: LiDAR for vegetated or terrain-heavy corridors where the bare-earth surface matters, high-resolution mapping camera for open corridors where the visible surface is enough. RTK or PPK GNSS reduces ground-control density without sacrificing accuracy class.
Most corridor work today flies under FAA Part 107 with the pilot keeping the aircraft within visual line of sight. Longer continuous pulls require a Beyond Visual Line of Sight (BVLOS) waiver, which has become more accessible but is still scoped per project. The forthcoming Part 108 framework is expected to formalize routine BVLOS operations: Skyflex tracks that rulemaking and updates clients on whether a planned program can wait for the regulatory pathway or needs a current waiver. The short version: we don’t quote you mileage we can’t legally fly.
Pipeline operators (oil, gas, refined-products, water), electric utilities and transmission operators, rail operators, state and federal transportation agencies, fiber and telecom carriers building out new ROW, and vegetation-management contractors who serve any of the above.
Our FAA-certified pilots are ready to deploy. Get your free site assessment today.